METTA twin surface pump starting panels – Main materials ABB

METTA electrical panels for surface pumps are designed for proper operation and control of the pumps, ensuring at the same time their protection by means of level electrodes or float switch.

Category: Brand:

METTA electrical panels for surface pumps are designed for proper operation and control of the pumps, ensuring at the same time their protection by means of level electrodes or float switch.

TWIN SURFACE PUMP STARTING TABLE 230V UP TO 2,2KW AS2D1___

  • Plastic watertight enclosure of protection class IP54
  • General bipolar load switch
  • Thermomagnetic switch according to the current drawn by the pump to protect against overload, overcurrent, short circuit
  • Power starter, one for each pump for direct starting
  • Possibility of connecting a float switch or level electrodes to protect against water shortage
  • I-0-II epilogical switch, one for each pump to select manual or automatic operation
  • Automatic operation with alternation of the starting order of the pumps in each new operating cycle, and parallel operation of both pumps in case of activation of the parallel operation command
  • Contacts for operation with floats, piezostats or timers in automatic operation
  • Indicator lights for operation, fault
  • Connection terminal block accompanied by wiring diagram

TWIN SURFACE PUMP START-UP TABLE 400V UP TO 5,5KW AS2D3___

  • Plastic watertight enclosure of protection class IP54
  • General load switch
  • Voltage, asymmetry, sequence and phase loss monitor with adjustable cut-off and reset times
  • Thermomagnetic switch, one for each pump sized according to its current absorbed for overload protection, overcurrent, short-circuit, with frontal auxiliary contact
  • Power starter, one for each pump for direct starting
  • Possibility of connecting a float switch or level electrodes for protection against water shortage
  • I-0-II relay, one for each pump to select manual or automatic operation
  • Automatic operation with alternation of the starting order of the pumps in each new operating cycle, and parallel operation of both pumps in case of activation of the parallel operation command
  • Contacts for operation with floats, piezostats or timers in automatic operation
  • Indicator lights for operation, fault, voltage error
  • Connection diagram with wiring diagram

TABLE FOR STARTING TWIN SURFACE PUMPS WITH WATER/AIR PRIMING AS2Y3___

  • IP54 metal sealed enclosure
  • General load break switch
  • Voltage, asymmetry, sequence and phase loss monitor with adjustable cut-off and reset times
  • Automatic “K” curve fuses for each pump combined with thermal relay, suitable for motor overcurrent protection, short-circuit and overload, or alternatively a thermomagnetic switch
  • HRC starter, one for each pump, sized according to the pump capacity
  • Possibility of connecting a float switch or level electrodes for protection against water shortage
  • I-0-II epilogical switch, one for each pump to select manual or automatic operation
  • Automatic operation with alternation of the starting order of the pumps in each new operating cycle, and parallel operation of both pumps in case of activation of the parallel operation command
  • Contacts for operation with floats, piezostats or timers in automatic operation
  • Indicator lights for operation, fault, voltage error
  • Connection terminal block accompanied by wiring diagram
CODE ADDITIONS
F

Free voltage contacts for operation and fault indication (for AS2D1__ boards)
Free voltage contacts for operation, fault and voltage fault indication (for AS2D3__and AS2Y3__ boards)
M 3-display instrument with voltage transformers
P Protection against dry operation by measuring power factor (cosφ) without Autoreset
Χ Reinforced universal socket
Ε LED interior lighting
  • Control and automation panels for starting a wide range of surface pumps.
  • Protection against dry running of pumps in the event of drainage of the pumping tank, by means of a float switch or level electrodes.
  • Starting of the pumps by means of a pressure switch, timer or adjustable differential level float switch with counterweight.
START-UP TABLES FOR 1 DRILLING PUMP
Type Voltage Hp KW Start-up Range Α Box material Protection Dimensions
H x W x D (mm)
AS2D1007
230V 1 0,75 DOL 4-6,3 ABS

IP54

500x400x180
AS2D1011 1,5 1,1 6,3-10 500x400x180
AS2D1015 2 1,5 6,3-10 500x400x180
AS2D1022 3 2,2 10-16 500x400x180
AS2D3007 400V 1 0,75 DOL 1,6-2,5



ABS








IP54




500x400x180
AS2D3011 1,5 1,1 1,6-2,5 500x400x180
AS2D3015 2 1,5 2,5-4 500x400x180
AS2D3022 3 2,2 4-6,3 500x400x180
AS2D3030 4 3 6,3-10 500x400x180
AS2D3040 5,5 4 6,3-10 500x400x180
AS2Y3055 400V 7,5 5,5


Υ/Δ




10-16*



METAL








IP54




600x500x200
AS2Y3075 10 7,5 10-16* 600x500x200
AS2Y3110 15 11 18-22 600x500x200
AS2Y3150 20 15 23-27 600x500x200
AS2Y3185 25 18,5 28-34 700x500x200
AS2Y3220 30 22 35-41 700x500x200
AS2Y3300 40 30 51-56 800x600x200
AS2Y3370 50 37 52-68 800x600x200

In the AS2Y3___ series a fuse with a thermal switch is used except for the asterisks where a thermomagnetic fuse is used.

  • Construction with main materials ABB
Scroll to Top